Baltic Pipe Project Announcement
Conventional Energy
Conventional Energy
Announced last week, Brunel has signed a contract to provide construction and inspection services to the Baltic Pipe project.
With an anticipated team of over 100 professionals needed to deliver the scope within the 2.5 year schedule, this will be a great scheme to be a part of.
Our Managing Director for Europe, Jeroen van Drunen, commented;
“We are extremely pleased with this Project award as it shows Brunel’s recognition once again as a preferred project partner of choice for multi-jurisdictional strategic and/or major capital projects within the energy & infrastructure industry sectors. We look very much forward to provide our survey, construction & installation supervision, (vendor) inspection and operational management expertise to the Project.”
The Baltic Pipe Project is being developed by GAZ-SYSTEM S.A. and Energinet.dk in a joint venture. The 36” Baltic Pipe offshore pipeline will be installed between the east coast of Denmark and the northern coast of Poland with first gas scheduled to flow from Denmark to Poland in October 2022.
Brunel’s scope under the contract will be the provision of (teams of) onshore and offshore construction supervisors, surveyors, quality inspectors, HSE advisors, site reps, pipe-lay vessel reps, landfall specialists and seabed intervention specialists and in Denmark, Poland, Offshore Baltic Sea and various vendor locations and marshalling yards across Europe. In addition Brunel will provide related logistics and Personal Protective Equipment (PPE).
You can reach our project team on baltic@brunel.net if you would like to know more.